Power Water

Client: PowerWater, NT (via McMahon Services)
Year: 2026
Power Edge developed and validated the SEL protection relay settings for the Darwin River Dam Expansion Project. The solution incorporated advanced protection logic, coordinated timing schemes, inter-trips, blocking functions and local/remote operational controls to support reliable high-voltage power station protection. Extensive off-site testing confirmed full operational performance prior to installation, reducing commissioning time and lowering on-site project costs
Power Edge Engineering