Client: Intercontinental Hotel, SA (via Lai Industries)

Year: 2025

Power Edge Engineering designed, tested and commissioned an 11 kV automatic transfer scheme for new Schneider Electric high-voltage switchgear. Following comprehensive FAT and SAT validation, the system was successfully deployed during a planned outage and operated as intended on first commissioning. The scheme provides high-reliability redundant power, automatically transferring to an alternate feeder within 250 milliseconds of a loss of mains event, ensuring continuity of supply for critical operations.

Power Edge Engineering

Helping commercial & industrial entities with their power projects.